Introduction
Journeyman Practice study guide with diagrams.
Quick answers
NEC rules are mandatory when they use "shall" or "shall not" and permissive when they use "shall be permitted" or "shall not be required"; informational notes are not enforceable.
- What is the difference between mandatory and permissive rules in the NEC?
- Mandatory rules identify actions that are specifically required or prohibited and are characterized by the terms "shall" or "shall not." Permissive rules identify actions that are allowed but not required and are characterized by the terms "shall be permitted" or "shall not be required." Explanatory material appears as informational notes or an informative annex and is informational only — NEC 90.5(C) and 90.5(D) state that such notes and annexes are not enforceable as requirements of the code. (NEC 90.5)
Introduction (Minnesota Class A Journeyworker)
Learning Objectives
1.1 How the Code Is Arranged
Section 90.3 divides the code into the introduction and nine chapters. Chapters 1 through 4 — General; Wiring and Protection; Wiring Methods and Materials; Equipment for General Use — apply generally. Chapters 5 through 8 — Specific Occupancies and Locations; Specific Equipment; Specific Conditions and Systems; Communications Systems, Outside and Entering Buildings — may supplement or modify the requirements that precede them. Chapter 9 consists of tables applicable only as referenced, and Informative Annex A through Informative Annex L are informational only.
1.2 Mandatory, Permissive, and Explanatory Text (Section 90.5)
Mandatory rules identify actions that are specifically required or prohibited and are characterized by the use of the terms shall or shall not.
Permissive rules identify actions that are allowed but not required and are characterized by the use of the terms shall be permitted or shall not be required.
Explanatory material appears as informational notes or an informative annex. Section 90.5(C) states that such notes are informational only and are not enforceable as requirements of the code, and 90.5(D) adds that informative annexes are not part of the enforceable requirements of the NEC.
The word shall is the trigger in every question stem: text that says "shall be permitted" offers a choice, and an informational note can never be the sole authority for rejecting an installation.
1.3 Enforcement and the Authority Having Jurisdiction (Section 90.4)
Section 90.4(A) states that the code is intended to be suitable for mandatory application by governmental bodies that exercise legal jurisdiction over electrical installations, including signaling and communications systems, and for use by insurance inspectors.
Section 90.4(B) places three responsibilities on the authority having jurisdiction for enforcement of the code: making interpretations of the rules, deciding on the approval of equipment and materials, and granting the special permission contemplated in a number of the rules.
Section 90.4(C) allows that authority, by special permission, to waive specific requirements or permit alternative methods where equivalent objectives can be achieved by establishing and maintaining effective safety. Section 90.4(D) covers the case where the code requires new products, constructions, or materials that may not yet be available when the code is adopted: the authority having jurisdiction may then permit products complying with the most recent previous edition of the code adopted by the jurisdiction.
1.4 Purpose and Limits (Section 90.2(B) and (C))
Section 90.2(B) states the purpose of the code: the practical safeguarding of persons and property from hazards arising from the use of electricity. The same subsection states that the code is not intended as a design specification or an instruction manual for untrained persons.
Section 90.2(C) makes a narrower promise: compliance with the code and proper maintenance result in an installation that is essentially free from hazard but not necessarily efficient, convenient, or adequate for good service or future expansion of electrical use. Future expansion and convenience are addressed instead in 90.8(A), a wiring planning rule, so a planning recommendation is not a condition of adequacy under 90.2(C).
1.5 What the Code Covers and What It Does Not (Section 90.2(A))
Under 90.2(A)(1), the code covers the installation and removal of electrical conductors, equipment, and raceways; signaling and communications conductors, equipment, and raceways; and optical fiber cables for:
Under 90.2(A)(2), the code does not cover:
1.6 Examination of Equipment and Units of Measurement (Sections 90.7 and 90.9)
Section 90.7 states the code's intent that factory-installed internal wiring or the construction of equipment need not be inspected at the time of installation, except to detect alterations or damage, if the equipment has been listed by a qualified electrical testing laboratory in accordance with 110.3(C). Section 90.9 governs how every number is read: metric units are in accordance with the International System of Units (SI), SI units appear first with inch-pound units immediately following in parentheses, and conversion is based on hard conversion except as provided in 90.9(C), where trade sizes, extracted material, industry practice, and safety are permitted to use soft conversion.
Code Navigation
| Topic | NEC Section | What It Contains |
|---|---|---|
| Mandatory and permissive rules | 90.5(A), 90.5(B) | Required or prohibited actions (shall, shall not); allowed actions (shall be permitted, shall not be required) |
| Explanatory material and annexes | 90.5(C), 90.5(D) | Informational notes and informative annexes; informational only, not enforceable |
| Code arrangement | 90.3, Figure 90.3 | Nine chapters; Chapters 5 through 8 supplement or modify; Chapter 9 tables as referenced |
| Enforcement and interpretations | 90.4(A), 90.4(B) | Mandatory application by governmental bodies; three responsibilities of the AHJ |
| Special permission and new products | 90.4(C), 90.4(D) | Equivalent-safety alternatives; products complying with the most recent previous edition |
| Purpose and adequacy | 90.2(B), 90.2(C) | Practical safeguarding; essentially free from hazard, not necessarily adequate for expansion |
| Covered locations | 90.2(A)(1) | Premises, yards, lots, parking lots, carnivals, industrial substations, utility buildings, shore power |
| Not covered | 90.2(A)(2) | Ships other than floating buildings, rolling stock, aircraft, vehicles, mines, utility-exclusive systems |
| Equipment examination and units | 90.7, 90.9 | Product approval; SI first, hard conversion, permitted soft conversion |
Common Exam Traps
Practical Field Points
Summary
Article 90 answers two questions that recur throughout the exam: who decides, and how strongly the text speaks. Section 90.3 arranges the code into nine chapters, with Chapters 1 through 4 applying generally, Chapters 5 through 8 supplementing or modifying what precedes them, Chapter 9 supplying tables applicable as referenced, and the informative annexes standing outside the requirements. Section 90.5 gives the language test: shall and shall not make a rule mandatory, shall be permitted and shall not be required make it permissive, and informational notes and informative annexes are explanatory material that is not enforceable. Section 90.4 vests interpretation, approval of equipment and materials, and special permission in the authority having jurisdiction. Section 90.2 sets the purpose as the practical safeguarding of persons and property from hazards arising from the use of electricity, disclaims any role as a design specification or instruction manual, and limits the promise to an installation essentially free from hazard but not necessarily efficient, convenient, or adequate for future expansion. It then draws the scope lines: premises and outdoor locations, supply connections, qualified utility buildings, and marina shore power are covered, while ships other than floating buildings, rolling stock, aircraft, and utility-exclusive systems are not.
Preparing for the Minnesota journeyworker license?
See the full licensing path, exam format, eligibility and application steps.
Ready to test this chapter?
Practice with exam-aligned questions and timed simulations.
Start Practicing Free